New floor is down

Last Saturday was our first day back in the big house. We had ordered and took delivery of 829 sq. ft. of Pergo flooring. I started that day putting it down and a full seven days later I finished. Actually I am about 99% finished. I have one threshold to put down and shoe molding around the perimeter. Neither will take long, but the molding will have to wait until a future trip home.

No work will be done on our basement remodel Thanksgiving week. Our plan was to paint the basement after Thanksgiving, but we just wouldn't have been able to get it done so we hired this job out. By the time we head back to the mountain house we will have a refinished basement. We are looking forward to seeing how it will look.

I will post a picture or two at a later date.